Floor is down.
I’m feeling proud. I thought Scott would do this part of the project but he is run down and his energy is very low. I’m grateful for the work he has done – several hours each night. But – I have done 85% of this project on my own. Not quite what I’d planned for, and put me waaay behind schedule. E will be home in a few minutes. She will sleep in the living room tonight, and probably tomorrow night, as her room is full of the contents of the spare room.
Next:
-Scrape bead off wall left behind by old baseboard
-Install new baseboard and door trim
-Caulk top edge of baseboard / trim
-Replace light switch
-Reload room
Figure about another 12 hours of work. Phew. I’m getting tired.