Floor

Floor is down. 

I’m feeling proud. I thought Scott would do this part of the project but he is run down and his energy is very low. I’m grateful for the work he has done – several hours each night. But – I have done 85% of this project on my own. Not quite what I’d planned for, and put me waaay behind schedule. E will be home in a few minutes. She will sleep in the living room tonight, and probably tomorrow night, as her room is full of the contents of the spare room. 

Next:

-Scrape bead off wall left behind by old baseboard

-Install new baseboard and door trim

-Caulk top edge of baseboard / trim

-Replace light switch

-Reload room

Figure about another 12 hours of work. Phew. I’m getting tired. 

This entry was posted in House. Bookmark the permalink.